· An Access Point location was completed by the college NE group.
· Further discussion on where the facilities application equipment will reside in the telecomm room.
· The infrastructure parts have arrived in facilities.
· The project is still on schedule further review of timeline will be discussed on Dec. 17th.
· Site visits.
· Some of the infrastructure has been installed in the telecomm closet.
· College cabling representative have communicated with the bookstore manager on estimated timed when the cabling will be removed and installed.
· Working with infrastructure has to when the AP’s can be installed.